Program monitoring
25 sites, nine areas, one placement plan.
Quotation-stage view of the VIT 2027 OOH plan: where the budget sits, how the sites score, and what the market is charging. Installation stages fill in as field data arrives.
Where the budget goes
quotation value by areaStage today
all 25 are quotationsProgram map
25 sites · colour by score
score ≥ 9.0
8.0 – 8.9
below 8.0
Strongest sites
by VIT scoreFormat mix
size · lightingInstallation tracker
From quotation to verified.
Every site starts as a quotation line. Approval, production, installation and verification are recorded here once the field data exists — the source workbooks do not carry them.
Site tracker
| # | Area | Site | Format | Score | Quotation | Stage |
|---|
Area progress
quoted sites per areaWhat the tracker needs
- Approval — client PO or signed quotation per site
- Production — vendor, print date, creative version
- Installation — install date, crew, photo evidence
- Verification — field check: lighting, angle, obstruction
Upload those four dates per site and this page turns into a live progress board without changing the layout.
Competitive intelligence
Where Danone sits on price.
Price positioning
What the gap means
median vs DanoneProduct price bands
P25 · median · P75, outlier-trimmed| Product | Owner | n | P25 | Median | P75 | Units sold |
|---|
Brand footprint
listings · sellers · citiesFindings
from the 24 Nov 2026 snapshotSite scoring
How a site earns its 0–10.
The VIT scorecard weights road class, position and consumer proximity. The scores on this dashboard are the ones supplied in the spot workbook — not re-scored here.
Consumer inputs
share of the 40% consumer blockRoad class reference
UU 38/2004 Pasal 8| Class | Min speed | Min width |
|---|
Score vs quotation
score vs quotation (Rp mn) · each dot is one siteAll sites by score
click a row to open the tracker| # | Area | City | Site | Score | Quotation |
|---|